ANSER was contracted by Abbotsford School District to do a service upgrade at a local high school. The project involved the removal of an existing 15kV unit sub and a 120/208V main distribution center located within a vault in the middle of the school. The existing equipment was replaced by a 800A 600V main service distribution center and a 2000A 120/208V sub distribution center along with a new pad mount transformer.